1.Lightning Counter Tester Supplier Please charge before use,To ensure charging effectiveness and extend battery life, use the dedicated charger. It takes about 3-4 hours to fully charge an empty battery. The red light on the charger indicates charging; the green light indicates charging is complete.
2、According to the installation height of the counter, properly extend the telescopic discharge rod.
3、For the dedicated grounding wire, insert one end's plug into the tail jack of the tester, and clamp the other end's clip to the ground.
4、Press the red button to turn on high voltage for about 1 second, the indicator light will light up (slight flicker),
Then gently click the connection end between the counter and the lightning arrester for testing.
5、After each click, the discharge rod tip should leave the counter. If repeated testing is needed, do not release the button; wait 1-2 seconds until the indicator light flickers again, then click to test again.
6、Continuous testing may cause the tester to heat up; please allow appropriate intervals. This reduces faults and extends battery life.
7、The tester output has three levels (DC900V, 1200V, 1600V) high, medium, and low, adjustable via the toggle switch on the head to suit testing different types or brands of counters.
8、If the indicator light does not flicker after pressing the button for more than 3 seconds, the battery needs charging.
9、Do not disassemble arbitrarily. If the battery pack capacity significantly decreases or charging efficiency is too low, it needs replacement; please purchase a dedicated battery pack from our company.
