This entry lacks an overview, information bar, and overview image. Add relevant content to make the entry more complete and quickly upgrade. Come on!
Table of Contents
- 1 Introduction
- 2 Level 4 Undertaking Configuration Table
- 3 Application Materials
Introduction
On December 1, 2017, the National Energy Administration made corresponding adjustments to the qualification equipment for electric power undertaking tests. The qualification equipment for undertaking tests in each province is the same, while some equipment that is not commonly used in the actual work of electric power enterprises has been omitted. Obtaining the Level 4 undertaking test qualification allows for the installation, maintenance, or testing of electric power facilities with voltage levels below 35 kV. [
Level 4 undertaking test equipment includes series resonance, power frequency withstand voltage test devices, DC high voltage generators, induced withstand voltage test devices, dielectric loss testers, loop resistance testers, and transformer ratio testers.
Article 17: Those who obtain the Level 4 undertaking test qualification for electric power facility installation (repair, test) licenses can engage in testing activities for electric power facilities with voltage levels below 35 kV. Applicants shall meet the following conditions:
(1) Legal person qualification and a sound organizational structure;
(2) Net assets of more than 6 million yuan;
(3) The technical director and safety director shall have more than 3 years of experience in managing electric power facility testing work and hold junior or above technical qualifications in electric power-related majors;
(4) More than 10 professional technical and economic management personnel, including more than 4 electric power-related engineering technicians;
(5) More than 6 electricians holding grid entry operation permits, including more than 2 high-voltage electricians and more than 3 special electricians;
(6) A sound and effective safety production organization and system, with safety training carried out in accordance with the law, and more than 1 safety management personnel;
(7) A fixed business site with a total area of more than 400 square meters, with various professional testing laboratories and testing equipment for electric power facilities with voltage levels above 35 kV;
(8) A sound technical archive management system.
Level 4 Undertaking Configuration Table
[3]
| No. | Equipment Name | Model | Specification | Unit | Quantity |
| 1 | High Voltage Generation Equipment | ||||
| 1 | DC High Voltage Generator | ZGF-120kV/2mA | DC: 120kV/2mA | Set | 1 |
| 2 | Power Frequency Withstand Voltage Test Device | YDJ-30kVA/50kV | AC: 30kVA/50kV | Set | 1 |
| YDJ-10kVA/50kV | AC: 6kVA-10kVA/50kV | Set | 1 | ||
| 3 | Variable Frequency Series Resonance Test Device | HTXZ-75kVA/75kV | 75kVA/75kV/1A 30~300Hz | Set | 1 |
| 4 | Induced Withstand Voltage Test Device | SBF-5kVA/500V | 5kVA/360V 150Hz | Set | 1 |
| 2 | Electrical Measuring Instruments | ||||
| 1 | High Voltage Dielectric Loss Tester | HTJS-V | 1. Dielectric measurement accuracy: 1% 2. Capacitance accuracy: 0.5% 3. Anti-interference variable frequency | Unit | 1 |
| 2 | Three-Phase Relay Protection Tester | HT-1200 | Three-phase voltage and current, 2 groups each | Unit | 1 |
| 3 | Loop Resistance Tester | HTHL-100A | DC: ≥100A | Unit | 1 |
| 4 | Transformer Volt-Ampere Characteristic Tester | HTFA-103 | 500V/5A | Unit | 1 |
| 5 | Ground Resistance Tester | HT2571 | Unit | 1 | |
| 6 | Transformer DC Resistance Tester | HTZZ-10A | DC: ≥10A | Unit | 1 |
| 7 | Transformer Ratio Tester | HTBC-H | Digital, class 0.5 | Unit | 1 |
| 8 | Circuit Breaker Characteristic Tester | HTGK-III | Unit | 1 | |
| 9 | Insulation Resistance Tester | GM-5kV | DC: 0~5000V 200G(Ω) Short-circuit current ≥3mA | Unit | 1 |
| 3 | Common Instruments and Meters | ||||
| 1 | Megohmmeter | HT2671 | DC: 2500V | Piece | 1 |
| 2 | Megohmmeter | HT2670 | DC: 500V | Piece | 1 |
| 3 | Digital Dual-Clamp Phase Volt-Ampere Meter | SMG2000B | Measurement current 1mA~5A | Piece | 1 |